Digital Library Search

Search results

Your search for Plan Bay Area returned 412 results
Sort results by:
  1. Lifeline Transportation Program Cycle 5

    located along high ridership corridors and in Community-Based Transportation Plan study areas. 2,405,763 ... in the Community Based Transportation Plan (CBTP). 2,051,426 83,748 1,514,825 3,649,999 2019 2 Route 14 Operating ... of aging equipment to provide safe, reliable, and operational elevators in an area servicing a community application/pdf

    Nov 05, 2020  PDF

  2. FTA Non-Urbanized Formula FY18 Program (5311)

    5311 FY18.pdf GL: FTA 5311 Rural Area Program FY2017-18 (TIP ID – VAR170019) Last updated with 2021 TIP ... Update Nov 05, 2020 GL: FTA 5311 Rural Area Program FY2017-18 (TIP ID – VAR170019) Last updated with 2021 ... TIP Update RTIP STIP TIP GL: FTA 5311 Rural Area Program FY2017-18 (TIP ID – VAR170019) Last updated application/pdf

    Nov 05, 2020  PDF

  3. FTA Non-Urbanized Formula FY17 Program (5311)

    5311 FY17.pdf GL: FTA 5311 Rural Area Program FY2016-17 (TIP ID – VAR170018) Last updated with 2021 TIP ... Update Nov 05, 2020 GL: FTA 5311 Rural Area Program FY2016-17 (TIP ID – VAR170018) Last updated with 2021 ... TIP Update RTIP STIP TIP GL: FTA 5311 Rural Area Program FY2016-17 (TIP ID – VAR170018) Last updated application/pdf

    Nov 05, 2020  PDF

  4. Local Highway Bridge Program (HBP)

    VAR170012- GL HBP_0.pdf Local Highway Bridge Program (HBP) File Name VAR170012- GL HBP_0.pdf GL: Highway Bridge Program (TIP ID – VAR170012) Last updated with 2021 TIP Update Nov 05, 2020 GL: Highway Bridge Program (TIP ID – VAR170012) Last updated with 2 application/pdf

    Nov 05, 2020  PDF

  5. SHOPP - Roadside Preservation

    Knoll Avenue to Oakville Cross Road. Advance mitigation credit purchases for planned SHOPP projects application/pdf

    Nov 05, 2020  PDF

  6. SHOPP - Bridge Preservation

    Bay, at the Pilarcitos Creek Bridge No. 35- 0139L/R; also on Route 84 at San Gregorio Creek Bridge No. application/pdf

    Nov 05, 2020  PDF

  7. SHOPP – Emergency Response

    $130 $318 $36 $315 $10 $1,264 $2,073 04 SM 1 Near Half Moon Bay, at 1.1 miles north of Santa Cruz application/pdf

    Nov 05, 2020  PDF

  8. SHOPP – Collision Reduction

    areas, construct Maintenance Vehicle Pullouts (MVPs) and upgrade crash cushions to reduce maintenance ... 101 to Route 17/880 Separation. Pave extended gore areas and narrow strips to improve highway worker ... ALA 61 16.4/18.1 In the cities of Oakland and Alameda, from Swan Road to Harbor Bay Parkway. Install application/pdf

    Nov 05, 2020  PDF

  9. SHOPP – Roadway Preservation

    and pave roadside areas to prevent vegetation growth and enhance highway worker safety. 2020F 0Q050 201.151 ... 1 27.5/34.8 In and near Half Moon Bay, from south of Wavecrest Road to south of Marine Boulevard. Rehabilitate ... Bodega Bay, Carmet, and Jenner, from 0.7 mile south of Middle Road to 2.3 miles north of Meyers Grade application/pdf

    Nov 05, 2020  PDF

  10. SHOPP - Mobility Program

    $1,750 $57,823 $13,819 $79,073 04 SM 1 26.4/47.3 In and near the cities of Half Moon Bay, Pacifica application/pdf

    Nov 05, 2020  PDF

  11. Highway Maintenance – Pavement Resurfacing/ Rehabilitation SHS

    IN ALAMEDA COUNTY, IN OAKLAND FROM 5TH AND 6TH STREET VIADUCT TO EAST BAY VIADUCT Replace with RHMA application/pdf

    Nov 05, 2020  PDF

  12. Highway Safety Improvement Program (HSIP)

    shoulders and provide law enforcement pullout areas to control vehicles speeding along the corridors. ... at Westcliffe Lane (unincorporated Walnut Creek area). Construct ADA curb ramp, curb, gutter, and sidewalk; ... in the Crockett area. Upgrade sub-standard MBGR guardrails to Caltrans standard MGS guardrails and end treatments application/pdf

    Nov 05, 2020  PDF

  13. FTA Non-Urbanized Formula FY16 Program (5311)

    $200,063 $170,181 $370,244 5 NAP Napa County Transportation and Planning Agency Operating Assistance ... Section 5311 FTIP Back-up List for FTA Section 5311 FY 2016 Rural Area Formula Program TIP ID: VAR150001 application/pdf

    Nov 05, 2020  PDF

  14. Lifeline Cycle 4 – 5307 JARC Set-aside

    Tri Delta Transit Route 200 and 201 Provide continued and expanded service between Bay Point ... PROGRAM OF PROJECTS (REG150004) Federal Share by Urbanized Area (UA) and Apportionment Year FY 2013 FY application/pdf

    Nov 05, 2020  PDF

  15. 5307 JARC Set-aside FY13 Large UA

    existing services on the following routes that serve low-income areas: 71, 76, 376, 800. All of the routes ... between Bay Point and central Concord and Martinez. 2017 126,353$ 126,353$ 252,706$ 7 CC Tri Delta ... Transit* Route 200 & 201 Provide service between Bay Point and central Concord and Martinez. 2019 application/pdf

    Nov 05, 2020  PDF

  16. Traffic Operations Systems and Mobility – Marin County

    load/off load area in Ayala Cove on Angel Island: Rehabilitate/replace gangway and gangway supporting application/pdf

    Nov 05, 2020  PDF

  17. GL: Pavement Resurfacing and/or Rehabilitation on the State Highway System – SHOPP Minor (TIP ID- VAR190001)

    District 4 Transportation Systems Management and Operations (TSM&O) Master Plan. 2AC70 0420000123 ... 1 Location(s) 04 Solano 80 6.7 In Solano County, in Vallejo at the Hunter Hill Safety Roadside Rest Area; also ... in Marin County at the Dana H. Bowers Safety Roadside Rest Area (SRRA Rehabilitation). Project will application/pdf

    Oct 15, 2020  PDF

  18. GL: Shoulder Improvements – SHOPP Roadside Preservation Program (TIP ID - VAR170011)

    Knoll Avenue to Oakville Cross Road. Advance mitigation credit purchases for planned SHOPP projects application/pdf

    Oct 15, 2020  PDF

  19. GL: Bridge Rehabilitation and Reconstruction – SHOPP Program (TIP ID – VAR170010)

    $20,124 04 SM 1 In Half Moon Bay, at the Pilarcitos Creek Bridge No. 35- 0139L/R; also on Route 84 at San application/pdf

    Oct 15, 2020  PDF

  20. GL: Emergency Relief – SHOPP Emergency Response Program (TIP ID – VAR170008)

    TOTAL SHOPP- Emergency Response 04 CC 4 48.1/48.3 Near Discovery Bay, at 0.1 mile west of Old River ... $250 $10 $600 $860 04 SON 1 Near Bodega Bay, at 0.1 mile south of Bay Hill Road. Replace failed ... $0 $0 $0 $0 $0 $0 $2,500 $0 $10,000 $12,500 04 SM 84 Near Half Moon Bay, south of Bear Gulch Road. application/pdf

    Oct 15, 2020  PDF

  21. GL: Safety Improvements – SHOPP Collision Reduction Program (TIP ID – VAR170007)

    to north of 7th Street. Pave narrow strips and miscellaneous areas, construct Maintenance Vehicle Pullouts ... 0.0/5.4 In and near San Jose, from Route 101 to Route 17/880 Separation. Pave extended gore areas ... to Harbor Bay Parkway. Install new and upgrade existing guardrail in the northbound direction. 2025F 2Q140 application/pdf

    Oct 15, 2020  PDF

  22. GL: Pavement Resurfacing/Rehabilitation – SHOPP Roadway Preservation (TIP ID – VAR170006)

    locations. Rehabilitate drainage systems, upgrade guardrail, and pave roadside areas to prevent vegetation ... $86,061 $120,999 04 SM 1 27.5/34.8 In and near Half Moon Bay, from south of Wavecrest Road to south ... $3,198 $68 $3,493 $10 $23,478 $32,383 04 SON 1 1.0/28.7 Near Bodega Bay, Carmet, and Jenner, from 0.7 application/pdf

    Oct 15, 2020  PDF

  23. GL: Safety Improvements – SHOPP Mobility Program (TIP ID – VAR170005)

    $20,800 04 ALA 80 1.9/4.0 In Emeryville and Oakland, from San Francisco- Oakland Bay Bridge Toll Plaza ... $2,080 $481 $1,750 $57,823 $13,819 $79,073 04 SM 1 26.4/47.3 In and near the cities of Half Moon Bay application/pdf

    Oct 15, 2020  PDF

  24. TIP Revision 19-39: MTC Approval Letter

    the funding plans of ten regional Surface Transportation Block Grant Program/Congestion Mitigation and Air ... • Updates the funding plans and back-up listings of eight State Highway Operation and Protection Program ... the funding plans of seven projects funded through various state and federal programs to reflect the latest application/pdf

    Oct 15, 2020  PDF

  25. TIP Revision 19-39

    Extensions Update the funding plan to reprogram CON from FY20 to FY21 $0 0.0% ALA170044 Bay Area Rapid ... and phases $0 0.0% SM-090015 Half Moon Bay Route 1 improvements in Half Moon Bay Update the funding plan ... Transit District (BART) Bay Fair Connection Update the funding plan to change the source for $50M in later application/pdf

    Oct 15, 2020  PDF