Digital Library Search

Search results

Your search for Plan Bay Area returned 28169 results
Sort results by:
  1. 2aii Town of Windsor Intersection Improvements Presentation

    conditions (operation) throughout the area during peak hours, with and without trains present. • Improve application/pdf

    Oct 23, 2018  PDF

  2. 2aii Town of Windsor Intersection Improvements Presentation

    conditions (operation) throughout the area during peak hours, with and without trains present. • Improve application/pdf

    Oct 23, 2018  PDF

  3. SFCTA Presentation: RM 3

    (expansion vehicles, grade separations) ►WETA / Port of San Francisco (Mission Bay Ferry Landing) ►AC Transit application/pdf

    Feb 13, 2017  PDF

  4. Metropolitan Transportation Commission (MTC) Title VI Complaint Form

    Bay Are Metro Center 375 Beale Street, Suite 800 San Francisco, CA 94105 Fax (415) 536-9800 Email application/pdf

    Dec 08, 2017  PDF

  5. 2020 NorCal Procurement Expo: May 29, 2020

    Transportation District, U.S. Small Business Administration, Norcal PTAC, Monterey Bay PTAC, CA Capital PTAC, US application/pdf

    May 29, 2020  PDF

  6. Means-Based Transit Fare Pricing Study Technical Advisory Committee (TAC) Meeting Minutes

    on Clipper. • There was a question of whether specific areas should be targeted, e.g., priority development ... areas (PDAs). Translink for TOD targeted specific areas. • Goal clarification: do we want to attract new application/pdf

    May 28, 2015  PDF

  7. GL: Emergency Relief – SHOPP Emergency Response Program (TIP ID – VAR170008)

    Emergency Response 04 CC 4 48.1/48.3 Near Discovery Bay, at 0.1 mile west of Old River Bridge. Construct ... $50 $4,000 $5,480 04 SON 1 Near Bodega Bay, at 0.1 mile south of Bay Hill Road. Replace failed ... $0 $0 $837 $850 $100 $850 $13 $909 $3,559 04 SM 84 Near Half Moon Bay, south of Bear Gulch Road. application/pdf

    Oct 18, 2019  PDF

  8. Pothole Fact Sheet

    area are “squared-up” until vertical sides exist in reasonably sound pavement. Tack oil is applied ... and equipment are cleared from the area. (Although this requires a second pass, it can improve patch performance ... deeper, usually require base repairs at a later time. The affected area is removed back to or down application/pdf

    Jan 01, 2015  PDF

  9. Libby Schaaf Biography

    and newcomers. Her four areas of focus as mayor are: holistic community safety, responsive trustworthy application/pdf

    Aug 19, 2015  PDF

  10. SFpark: Circle Less, Live More

    / 9 Pilot areas OVERVIEW PRESENTATION / 6 Parking sensors OVERVIEW PRESENTATION / 7 Better information application/pdf

    Sep 30, 2015  PDF

  11. Final 2016 RTIP Schedule

    Area – Actions by Caltrans or CTC application/pdf

    Aug 03, 2015  PDF

  12. 30171542-c25a-403f-9a73-b7bffcb60f73.pdf

    Collection b) Designation of Transportation Management Areas c) Rail Fixed Guideway Systems; State Safety application/pdf

    Dec 11, 2015  PDF

  13. bc8ba2f3-5769-4f47-8732-1e211a3f3b6a.pdf

    Kristen Mazur • 08_FTA_Circulars.pdf a. Final section 5311 Rural Areas Circular application/pdf

    Dec 11, 2015  PDF

  14. 1018_M_Administration_Committee_15-05-13_Meeting_Minutes.pdf

    On-call Priority Development Area Technical and Staffing Assistance: Nelson Nygaard Consulting Associates* application/pdf

    Apr 01, 2016  PDF

  15. 2aii Byron Highway Byer Rd Safety Improvements Project Presentation

    the traffic circulation on the principal arterial, localized to the adjacent middle school in a rural area application/pdf

    May 24, 2017  PDF

  16. MetroCenter Map

    • Amtrak C.L. Dellums Station (2nd and Alice Streets) • Auto From the San Francisco Bay Bridge, take I-580 application/pdf

    Aug 31, 2015  PDF

  17. 2017 TIP Appendix A-75: Fiscal Constraint for the 2017 TIP

    $653,320 $814,875 $443,631 $537,251 $2,449,077 5307/5340- Urbanized Area Formula Grants $215,403 $219,807 ... Formula Grants for Rural Areas $1,551 $1,588 $1,626 $1,664 $6,428 5311f- Intercity Bus 5337- State of Good application/pdf

    Sep 28, 2016  PDF

  18. Financiamiento estatal para el transporte: Mitos y hechos

    Transporte, la agencia de planificación y financiamiento del transporte en los nueve condados del Área de la ... calcula que los residentes de las áreas urbanizadas de San Francisco-Oakland y San José gastan actualmente application/pdf

    Sep 26, 2018  PDF

  19. Top 50 Congestion Locations, 2014 — Ordered by Rank

    PM Fair Oaks Avenue to Oakland Road 4 SF 101/80 N/E 6,210 1:00 PM–8:30 PM I-280 to western end of Bay ... PM–7:40 PM Bay Bridge Toll Plaza to US-101 23 ALA 80 W 1,710 1:45 PM–7:00 PM Gilman Road to I-580 split 24 application/pdf

    Dec 17, 2015  PDF

  20. GL: Safety Improvements – SHOPP Mobility Program (TIP ID – VAR170005)

    6,765$ 10,757$ 04 Alameda 80 1.9/4.0 In Emeryville and Oakland, from San Francisco- Oakland Bay Bridge ... 1 26.4/R47.3 In and near the cities of Half Moon Bay, Pacifica and Daly City, from south of Miramontes Point application/pdf

    Jun 15, 2018  PDF

  21. GL: Safety Improvements – SHOPP Mobility Program (TIP ID – VAR170005)

    201.310 $5,200 $0 $0 $5,200 04 SM 1 26.4/R47.3 In and near the cities of Half Moon Bay, Pacifica and Daly ... In Emeryville and Oakland, from San Francisco-Oakland Bay Bridge Toll Plaza to north of Powell Street; also application/pdf

    Aug 01, 2018  PDF

  22. GL: Emergency Relief – SHOPP Emergency Response Program (TIP ID – VAR170008)

    Near Discovery Bay, at 0.1 mile west of Old River Bridge. Construct retaining walls to repair storm ...   04 SM 1  1.1 Near Half Moon Bay application/pdf

    Oct 11, 2018  PDF

  23. Safety & Emergency Procedures

    Program, UC Berkeley, 2008 5. Set Up a Safety and Health Program Make sure all jobs and work areas are free ... trade-specific programs in your area. Apprenticeship Programs. Call the Division of Apprenticeship Standards ... Headquarters at ☎ (415) 703-4920 to find out about apprenticeship programs for specific trades in your area application/pdf

    Nov 01, 2018  PDF

  24. GL: Safety Improvements – Highway Safety Improvement Program (TIP ID – VAR170002)

    Palo Verde Rd and Highway 84. Pave existing shoulders and provide law enforcement pullout areas ... Boulevard at Bridgefield Road and Walden Road at Westcliffe Lane (unincorporated Walnut Creek area ... locations on arterials and major collector roadways in the Crockett area. Upgrade sub-standard MBGR application/pdf

    Jan 17, 2020  PDF

  25. Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2003

    Financial_Report_03.pdf Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2003 File Name Financial_Report_03.pdf Metropolitan Transportation Commission Oct 03, 2003 Comprehensive Annual Financial Report Financing Funding Metropolita application/pdf

    Oct 03, 2003  PDF