Digital Library Search

Search results

Your search for Plan Bay Area returned 412 results
Sort results by:
  1. TIP Revision 17-35: MTC Approval Letter

    Association of Bay Area Govemmentll Libby SchRRf Oak.land Mayor's Appointee Worren Slocum San Mateo ... Director, Local Government Services e METROPOLITAN TRANSPORTATION COMMISSION Bay Area Metro Center 375 Beale ... ofTra.nsporoation Feder,,/ D. Glov.r Contr.t Cosœ County Anne W. HRlsted S:m Francisco Bay Conservation:and application/pdf

    Sep 13, 2018  PDF

  2. TIP Revision 17-35

    Plan Operations, Transit and Commuter Parking RTP Description: SF Bay Area: Regionwide: Design, ... $9M in CON STP from FY20 to FY22 $0 0.0% System: Transit SF-170016 Bay Area Rapid Transit District ... Bay Area Forward- Active Traffic Management, Arterial Operations, Connected Vehicles, Shared Mobility, application/pdf

    Sep 13, 2018  PDF

  3. 2017 TIP Grouped Listing: FTA Non-Urbanized Formula Program (5311) - FY19 and FY20

    Section 5311 FY 2019 Rural Area Formula Program TIP ID: VAR170026 As Updated with TIP Revision 2017-37 No. ... Subtotal Total Grouped Listing FTIP Back-up List for FTA Section 5311 FY 2020 Rural Area Formula Program application/pdf

    Aug 16, 2018  PDF

  4. 2017 TIP Grouped Listing: SHOPP – Minor Program

    In Halfmoon Bay, at the Route 1/Route 35 Intersection. Bicycle safety and access improvements (green zone application/pdf

    Aug 01, 2018  PDF

  5. GL: Safety Improvements – SHOPP Mobility Program (TIP ID – VAR170005)

    201.310 $5,200 $0 $0 $5,200 04 SM 1 26.4/R47.3 In and near the cities of Half Moon Bay, Pacifica and Daly ... In Emeryville and Oakland, from San Francisco-Oakland Bay Bridge Toll Plaza to north of Powell Street; also application/pdf

    Aug 01, 2018  PDF

  6. GL: Safety Improvements – Highway Safety Improvement Program (TIP ID – VAR170002)

    in the unincorporated Bay Point area Bay Point Sign Upgrade Project: Replacement of existing regulatory and warning ... pullout areas to control vehicles speeding along the corridors. $418,000 $376,200 $41,800 $0 $0 $0 ... (unincorporated Walnut Creek area). Construct ADA curb ramp, curb, gutter, and sidewalk; Install Rectangular Rapid application/pdf

    Aug 01, 2018  PDF

  7. TIP Revision 17-33: MTC Approval Letter

    TRANSPORTATION COMMISSION Bay Arca ~Vlctro Center 375 Beale Street. Suite HOO San Francisco. C,\ 9+105 ... the funding plan of thirty six projects to reflect updates to the FY2016- 17, FY2017-18, FY2018-19 ... the funding plan of WET A's Ferry Major Component Rehabilitation and Replacement project to reflect application/pdf

    Aug 01, 2018  PDF

  8. TIP Revision 17-33

    Bay Area Rapid Transit District (BART) BART: Railcar Procurement Program Update the funding plan ... Drrecror. Local (~,..\'mmC"nl 5c.-n1c."n e METROPOLITAN TRANSPORTATION COMMISSION Bay Arca ... in funding of $21.4 million. Among other changes, this revrsion: • Updates the funding plan of thirty six application/pdf

    Aug 01, 2018  PDF

  9. TIP Revision 17-37: MTC Approval Letter

    plan of one additional project to reflect the programming decisions in the One Bay Area Grant Program ... Anne W. H11/sttd San Fra.nc.sco Bay Conservation:md Development Commission Nick Jorefowitr. S:rn ... Mayor's Appointee A/fr,® Pedro:u, Napa County and Cities Julie Pian Association of Bay Arca Governments application/pdf

    Jul 25, 2018  PDF

  10. TIP Revision 17-37

    Sonoma Marin Area Rail Corridor Update the funding plan to add $21M in SB1-RRAA-TIRCP funds to FY19 ... and Emission Reduction TechnologyRTP Description: SF Bay Area: Region-wide: Implement a digitally-based ... Area: Region-wide: Implement strategies to grow carsharing in the Bay Area including developing policies application/pdf

    Jul 31, 2018  PDF

  11. GL: Safety Improvements – SHOPP Collision Reduction Program (TIP ID – VAR170007)

    on East Bay Regional Parks District (EBRPD) land. Required environmental mitigation (site 2) for EA 17240, ... 20.4/22.9 In San Leandro, between Washington Avenue and Marina Boulevard. Pave side slope areas. 4H010 0085X ... on Route 24 between 1.8 and 6.0 miles. Pave beyond gore areas. 4G970 0481F 2016/17 201.235 1,350$ 5$ 1,519$ application/pdf

    Jul 17, 2018  PDF

  12. TIP Revision 17-34: MTC Approval Letter

    Glover Contra Costa C".ounty Ann• W. HtÚsttd S:an Francisco B:ay Conservation and Development application/pdf

    May 23, 2018  PDF

  13. A-04 Draft 2019 TIP Performance Assessment.pdf

    by Caltrans for the Bay Area urbanized areas align with the mode shift targets adopted by MTC through Plan Bay ... consideration in interpreting these results centers on the narrow focus of the TIP. Compared to Plan Bay Area ... TIP cycle. The performance analysis of Plan Bay Area 2040 presents a more comprehensive Draft 2019 TIP application/pdf

    Jun 18, 2018  PDF

  14. Draft 2019 TIP Performance Assessment

    by Caltrans for the Bay Area urbanized areas align with the mode shift targets adopted by MTC through Plan Bay ... consideration in interpreting these results centers on the narrow focus of the TIP. Compared to Plan Bay Area ... TIP cycle. The performance analysis of Plan Bay Area 2040 presents a more comprehensive Draft 2019 TIP application/pdf

    Jun 18, 2018  PDF

  15. Draft 2019 TIP Transit Financial Capacity Assessment

    and Capital As part of the San Francisco Bay Area’s long range transportation plan—Plan Bay Area 2040— ... This includes $122 billion in operating costs plus $47 billion for capital replacement. The Plan Bay Area 2040 ... Capacity Assessment. However, while the projections developed for Plan Bay Area 2040 are appropriate application/pdf

    Jun 18, 2018  PDF

  16. 2019 TIP County Summaries

    RTP/Sustainable Communities Strategy, Plan Bay Area 2040. Draft 2019 TIP S3- 4 June 18, 2018 Highway and major ... At the heart of the nine-county San Francisco Bay Area, Alameda County is the second- largest county, ... supporting economic growth in the Bay Area, California and the rest of the nation. The county’s application/pdf

    Jun 18, 2018  PDF

  17. 2019 TIP Overview

    Metropolitan Planning Organization (MPO) for the nine- county San Francisco Bay Area, Metropolitan ... Bay Area 2040 Plan Bay Area 2040 is the comprehensive regional plan for the nine-county Bay Area ... (RTP) and Sustainable Community Strategy (SCS) for the Bay Area. The current plan is available online application/pdf

    Jun 18, 2018  PDF

  18. Draft 2019 TIP Table of Contents

    4374...................................................................................... A-5 Regional Policies: Long-Range Planning/Plan Bay Area MTC Public Participation Plan for the San ... For the Nine-County San Francisco Bay Area June 18, 2018 MTC Resolution No. 4375 Volume I Overview and Project ... Transit)................................... S4- 1 Bay Area Rapid Transit District (BART)..................................................... application/pdf

    Jun 18, 2018  PDF

  19. Draft Transportation-Air Quality Conformity Analysis for the Amended Plan Bay Area and the 2019 Transportation Improvement Program

    Plan Bay Area and the 2019 Transportation Improvement Program File Name AQ_Conformity_2019_TIP.pdf Jun application/pdf

    Jun 18, 2018  PDF

  20. Draft 2019 TIP Project Listings

    122,750Total Programmed Funding: End of section Draft 2019 TIP June 18,20186S4- Transit Projects Bay Area Rapid ... collection equipment. Project Name: Description: Bay Area Rapid Transit District (BART)Sponsor: Bay Area ... the entry plaza Project Name: Description: Bay Area Rapid Transit District (BART)Sponsor: Bay Area Rapid application/pdf

    Jun 18, 2018  PDF

  21. Draft 2019 TIP Roadway Project Listings

    connections between I-880, the Posey and Webster tubes and the downtown Oakland area. Project Name: ... Roadway Projects Alameda County State Highway Projects Bay Bridge Forward- West Grand HOV/Bus Only Lane ... outside the urbanized area Route: Post Mile From: Post Mile To: Toll Phase Fund Source Prior Years FY application/pdf

    Jun 18, 2018  PDF

  22. Draft 2019 TIP Single Line Project Listing

    Access Staging Area Project Berkeley: Berkeley Marina: Construct segment 3 of Bay Trail Extension, ... Transit: East Bay Bus Rapid Transit Alameda County: Along Broadway/ International/E 14th corridor from ... Freight Intelligent Transportation System (FITS) Oakland: In the Port of Oakland and surrounding areas application/pdf

    Jun 18, 2018  PDF

  23. Draft 2019 TIP Transit Project Listings

    122,750Total Programmed Funding: End of section Draft 2019 TIP June 18,20186S4- Transit Projects Bay Area Rapid ... collection equipment. Project Name: Description: Bay Area Rapid Transit District (BART)Sponsor: Bay Area ... the entry plaza Project Name: Description: Bay Area Rapid Transit District (BART)Sponsor: Bay Area Rapid application/pdf

    Jun 18, 2018  PDF

  24. Draft 2019 TIP Appendices A-06 through A-14: Regional Policies: Long-Range Planning/Plan Bay Area

    Planning/Plan Bay Area File Name A-06_through_A-14.pdf Jun 18, 2018 TIP application/pdf

    Jun 18, 2018  PDF

  25. Draft 2019 TIP Appendix A-1: Adoption of the 2019 TIP (MTC Resolution No. 4375)

    in the 2019 TIP are consistent with Plan Bay Area 2040 (the 2040 Regional Transportation Plan including ... This resolution adopts the 2019 Transportation Improvement Program (TIP) for the San Francisco Bay Area. Further ... Francisco Bay Area pursuant to California Government Code Section 66500 et seq.; and WHEREAS, MTC application/pdf

    Jun 18, 2018  PDF