Digital Library Search

Search results

Your search for Plan Bay Area returned 9 results
Sort results by:
  1. 2020 RTIP Policies and Procedures (Adopted Sept. 2019)

    the opportunity to update existing project funding plans and schedules. To meet the CTC deadline, the Bay Area ... is the regional transportation planning agency for the San Francisco Bay Area pursuant to Government Code Section ... Management Agency (CMA) or County Transportation Planning Agency, Collectively known as the Bay Area County application/pdf

    Sep 25, 2019  PDF

  2. Template: 2020 RTIP-STIP Resolution of Local Support

    for the programming discretion of the Metropolitan Planning Organization (MPO) and the Regional Transportation ... Planning Agency (RTPA); and WHEREAS, pursuant to the FEDERAL TRANSPORTATION ACT, and any regulations ... and RTPA for the nine counties of the San Francisco Bay region; and WHEREAS, MTC has adopted a Regional application/pdf

    Sep 25, 2019  PDF

  3. 2020 STIP Guidelines

    of Transportation, regional transportation planning agencies, county transportation commissions and local agencies. ... funds. • Limitations on planning, programming, and monitoring (PPM). The Fund Estimate includes a table ... a full funding plan commitment. • Advance Project Development Element (APDE). There is no APDE capacity application/pdf

    Sep 25, 2019  PDF

  4. 2020 STIP Fund Estimate

    0 0 0 0 0 0 (86,000) Bay Area Ferry Operations/Waterborne (3,342) (3,375) (3,409) (3,443) (3,477) (3,512) (17,216) ... consists of preliminary engineering, planning, design, and construction engineering. From the $2.6 billion ... Statewide Planning (19) (19) (20) (20) (21) (21) (101) (119) Maintenance (400) (273) (259) (259) (259) (259) application/pdf

    Sep 25, 2019  PDF

  5. 2016 STIP Fund Estimate County Targets

    0 San Francisco 0 San Mateo 0 Santa Clara 0 Solano 0 Sonoma 0 Bay Area Totals 0 Table 2: Planning ... 0 Marin 0 Napa 0 San Francisco 0 San Mateo 0 Santa Clara 0 Solano 0 Sonoma 0 Bay Area Totals 0 Note: application/pdf

    Aug 04, 2015  PDF

  6. 2016 STIP Guidelines

    of RTIPS. The Regional Transportation Planning Agency (RTPA) Group has voluntarily developed a template ... as they are eligible for State Highway Account or Federal funds.  Limitations on planning, programming, and monitoring ... after the initial adoption. Commission staff will maintain an “AB 3090 Plan” which will include projects application/pdf

    Aug 27, 2015  PDF

  7. 2016 STIP Fund Estimate

    ASSISTANCE Bay Area Ferry Operations/Waterborne ($3,211) ($3,243) ($3,276) ($3,308) ($3,341) ($3,375) ... planning, design, and construction engineering. The 2016 STIP FE projects a new, estimated STIP program ... is roughly $8.0 billion as identified in the 2015 Ten-Year SHOPP Plan. As a result of the approximately $5.6 application/pdf

    Aug 27, 2015  PDF

  8. TIP Revision 2015-09 Approval

    the funding plans of seven proj ects funded through the Transit- 000000 Capital Priorities program, including ... the expanded scope of the project; • Updates the funding plans of two Surface Transportation Program/Congestion ... was developed through a continuing, cooperative, comprehensive transportation planning 11 process in accordance application/pdf

    Sep 04, 2015  PDF

  9. TIP Revision Summary 2015-09

    Maintenance AA ROLLING STOCK MAINT/REHABTRANSIT RAIL:100% Plan Bay Area EXEMPT (40 CFR 93.126)- Operating ... ROAD BIKE/PED:100% Plan Bay Area EXEMPT (40 CFR 93.126)- Bicycle and pedestrian facilities RTP Cycle: ... Routes to Schools Various Locations PR ENHANCEMENTS SYSTMGMTLOCAL ROAD BIKE/PED:100% Plan Bay Area EXEMPT application/pdf

    Sep 04, 2015  PDF